Wyndham Grand Batumi Gonio. Villas. — 1. Installation of sewer outlets, Villa 16. It is necessary to ensure proper connection of the drainage system and the functionality of the sewerage system. 2. Concrete curing for columns, Villas 8 and 9. It prevents cracking and enhances the concrete’s strength, ensuring the durability of the structure. 3. Preparation of a level base, Villa 16. It is essential for the stability of the foundation. 4. Installation of drainage in the retaining section of the fence.