Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Plastering, the 2nd, 3rd floors.
Plastering of inner walls.
2. Installation of drywall framing, on the 1st floor.
Installation of guide frames for drywall partitions, drywall frame installation.
3. Cast-in belt pouring for roof parapets.
Concrete pouring.
Building B.
1. Installation of ledges for the stained glass windows.
On the 2nd floor.