Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Plastering, the 2nd, 3rd floors.
Plastering of inner walls.
2. Installation of drywall framing, on the 1st floor.
Installation of guide frames for drywall partitions, drywall frame installation.
3.
Concrete pouring.
Building B.
1. Installation of ledges for the stained glass windows.
On the 2nd floor.