Wyndham Grand Batumi Gonio. Aqua
1. Installation of elevator shafts.
Installation of elevator equipment.
2. Arrangement of gypsum cardboard frame.
Arrangement of the framework of partitions.
3. finishing works, 20th floor.
Laying tiles on the balconies.
4. Plastering works.
Decorative plastering, 3, 9 floors.
5. Masonry works, 10 floor.
Laying ceramic block.
6. Infrastructure building.
Dismantling of formwork.