Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of elevator shafts.
Installation of elevator equipment.

2. Arrangement of gypsum cardboard frame.
Arrangement of the framework of partitions.

3. finishing works, 20th floor.
Laying tiles on the balconies.

4. Plastering works.
Decorative plastering, 3, 9 floors.

5. Masonry works, 10 floor.
Laying ceramic block.

6. Infrastructure building.
Dismantling of formwork.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news