Wyndham Grand Batumi Gonio. Aqua
1. Installation of elevator shafts.
— Installation of elevator equipment, installation of doors.
— Painting in elevator shafts.
— Installation of lighting in elevator shafts.
2. plastering works, 18th floor.
Arrangement of decorative plaster.
3. Plasterboard frame installation works.
Arrangement of the ceiling frame on the balconies.
4. Arrangement of curbs for installation of stained glass windows.
Concreting of curbs.
5. Infrastructure building.
Reinforcement of the floor slab of the 2nd floor.