Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of elevator shafts.
— Installation of elevator equipment, installation of doors.
— Painting in elevator shafts.
— Installation of lighting in elevator shafts.

2. plastering works, 18th floor.
Arrangement of decorative plaster.

3. Plasterboard frame installation works.
Arrangement of the ceiling frame on the balconies.

4. Arrangement of curbs for installation of stained glass windows.
Concreting of curbs.
5. Infrastructure building.
Reinforcement of the floor slab of the 2nd floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news