Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering work.
— Plastering of slopes, 1st and 4th floors.
— Plastering walls, 2nd floor.
2. Facade work.
— Facade and slope cladding with clinker tiles.
— Facade insulation.
3. Plasterboard frame installation work, 3rd floor.
Ceiling frame covering.
4. Waterproofing work.
Preparatory work for waterproofing terraces.
5. Installation of stained glass structures.
Installation of double-glazed windows.
Block B.
1. Installation of stained glass structures.
Installation of stained glass windows.