Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Family Club.

Wyndham Grand Batumi Gonio. Family Club.

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
— Plastering of slopes, 1st and 4th floors.
— Plastering walls, 2nd floor.

2. Facade work.
— Facade and slope cladding with clinker tiles.
— Facade insulation.

3. Plasterboard frame installation work, 3rd floor.
Ceiling frame covering.

4. Waterproofing work.
Preparatory work for waterproofing terraces.

5. Installation of stained glass structures.
Installation of double-glazed windows.

Block B.
1. Installation of stained glass structures.
Installation of stained glass windows.