Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, laying electrical cables, 12th floor.
— Plumbing work.
— Installation of air conditioning pipes, 20th floor.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame, 11th-13th floors.
Installation of frame for inter-unit partitions, covering of frame.
4. Finishing works, 19th floor.
Laying tiles on balconies.
5. Roof work.
Tie beams.
6. Infrastructure building.
Installation of floor slab formwork, 6th floor.