Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, laying electrical cables.
— Plumbing work.
— Installation of air conditioning system.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame.
Installation of inter-unit partition frames, frame sheathing.
4. Finishing work, 19th floor.
Tiling on balconies.
5. Facade work.
Plastering of the facade.
6. Roof work.
Binding of posts.
7. Installation of a panoramic elevator.
Installation and reinforcement of panoramic elevator slabs.
8. Infrastructure building.
— Reinforcement of floor slabs, 6th floor.
— Laying of ceramic blocks, 2nd floor.