Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, laying electrical cables.

— Plumbing work.

— Installation of air conditioning system.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame.

Installation of inter-unit partition frames, frame sheathing.

4. Finishing work, 19th floor.

Tiling on balconies.

5. Facade work.

Plastering of the facade.

6. Roof work.

Binding of posts.

7. Installation of a panoramic elevator.

Installation and reinforcement of panoramic elevator slabs.

8. Infrastructure building.

— Reinforcement of floor slabs, 6th floor.

— Laying of ceramic blocks, 2nd floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news