Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

— Installation of air conditioning pipes.

2. Installation of plasterboard frame.

Installation of frame for inter-unit partitions, insulation of internal partitions.

3. Finishing works, 8th, 18th-19th floors.

Laying tiles on balconies.

4. Infrastructure building.

— Reinforcement of vertical structures, 8th floor.

— Laying ceramic blocks, 4th floor.