Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

— Installation of air conditioning pipes.

2. Installation of plasterboard frame.

Installation of frame for inter-unit partitions, insulation of internal partitions.

3. Finishing works, 8th, 18th-19th floors.

Laying tiles on balconies.

4. Infrastructure building.

— Reinforcement of vertical structures, 8th floor.

— Laying ceramic blocks, 4th floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news