25.07.2024 — Wyndham Grand Residences Batumi Gonio. Aqua

Ceramic block walls are being laid on the 1st construction (Ground Floor) floor. The mocap installation is continuing on the 13th (12th) floor. Balcony framing…

24.07.2024 — Wyndham Grand Residences Batumi Gonio. Aqua

Concreting of the site for the installation of the passenger and freight hoist has been carried out on the territory. On the 1st construction (Ground Floor)…

24.07.2024 — Elite Family Residence

Installation of heating and cold/hot water supply systems, masonry of elevator portals with gas-silicate block, tank connections are in progress. Painting works…

24.07.2024 — Wyndham Grand Residences Batumi Gonio.

Villas — Reinforcement of the foundations continues, as well as installation of foundation formwork and fencing of the complex.

24.07.2024 — Wyndham Grand Residences Batumi Gonio. Family Club

Block A Ceramoblock walls on the 3rd floor and dismantling of elevator shaft formwork. Block B Reinforcement of vertical structures.

24.07.2024 — Wyndham Grand Residences Batumi Gonio.

Riviera — The following works are in progress in Block E: - installation of staircase formwork - laying of ceramoblock walls - installation of technological…

Georgia's GDP Continues to Grow in 2023

In June 2023, Georgia's GDP increased by 7.7%. The average growth rate for the first half of 2023 was 7.6%, according to the Georgian National Statistical…

New Premium Hotel From Wyndham Hotels & Resorts Opens in Greece

The world’s largest hotel network, Wyndham Hotels & Resorts, has unveiled its first European property under one of its two premium brands, Registry Collection…