23.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera

Block A: wall masonry with ceramic block continues. Block B: installation of formwork for the first stage of vertical structures and reinforcement of the second…

23.03.2024 — Wyndham Grand Residences Batumi Gonio. Aqua

On the 18th construction (17 hotel) floor the walls are being masoned with ceramic block.

22.03.2024 — Elite Family Residence

Installation of internal electrical and lighting systems continues on the floors. Work is also underway to install technological openings.

22.03.2024 — Wyndham Grand Residences Batumi Gonio.

Aqua — On the 18th construction (17 hotel) and 16th (15) floors, the walls are being masoned with ceramic block.

21.03.2024 — Elite Family Residence

Facade works are underway. Installation of internal electrical and lighting systems continues on the floors. Work is also underway to install technological…

21.03.2024 — Wyndham Grand Residences Batumi Gonio. Family Club

Block A: the floor slab formwork of the 5th floor is being assembled. Block B: the floor slab formwork is being assembled at the 0.00 level.

Georgia's GDP Continues to Grow in 2023

In June 2023, Georgia's GDP increased by 7.7%. The average growth rate for the first half of 2023 was 7.6%, according to the Georgian National Statistical…

New Premium Hotel From Wyndham Hotels & Resorts Opens in Greece

The world’s largest hotel network, Wyndham Hotels & Resorts, has unveiled its first European property under one of its two premium brands, Registry Collection…