Wyndham Grand Batumi Gonio news

Construction progress, complex updates and real estate investment news from Batumi

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Villas.

1. reinforcement of the floor slab, Villa 1.4 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand loads…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Riviera.

1. Laying of ceramic block. Block B on the 3rd floor, Block C on the 2nd floor, Block E on the 3rd floor on the terrace Laying ceramic blocks in compliance with…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Family Club.

Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Aqua —

1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Aqua.

1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Family Club.

Building A 1. Formwork is installed, concrete is poured and compacted. Once the concrete has reached its strength, the formwork is dismantled and the stained…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Riviera.

1. Ceramoblock masonry. Block E on the 3rd floor on the terrace Check all dimensions and compliance with technological norms. Due to unfavorable weather…

Real estate 1 min read 1 views
Elite Family Residence

1. Laying of porcelain stoneware, units on the 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and the…

Real estate 1 min read 0 views
Elite Family Residence

1. Laying of porcelain stoneware, units on the 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and the…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Villas.

1. reinforcement of the floor slab, Villa 13 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand loads…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Riviera.

1. Ceramoblock masonry. Block B on the 3rd floor, Block C on the 1st floor, Block E on the 3rd floor Check all dimensions and compliance with technological…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Family Club.

Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Aqua

1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel…

Real estate 1 min read 0 views
Elite Family Residence

1. Laying of porcelain stoneware, units on the 1st , 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio.

Villas. — 1- Reinforcing the floor slab, Villa 13 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Riviera.

1. Ceramoblock masonry. Block B on the 3rd floor, Block C on the 1st floor, Block E on the 3rd floor Checking all dimensions and compliance with technological…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Family Club.

Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained…

Real estate 1 min read 0 views
Wyndham Grand Batumi Gonio. Aqua

1. diamond drilling of engineering holes, 10 and 12 floors The marking and drilling is carried out, which is necessary for the installation of communications of…

Real estate 1 min read 0 views
Elite Family Residence

1. Laying of porcelain tiles, units on the 1st, 2nd and 4th residential floor Leveling of the surface and laying of tiles with respect to joints and necessary…