1. reinforcement of the floor slab, Villa 1.4 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand loads…
Construction progress, complex updates and real estate investment news from Batumi
1. reinforcement of the floor slab, Villa 1.4 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand loads…
1. Laying of ceramic block. Block B on the 3rd floor, Block C on the 2nd floor, Block E on the 3rd floor on the terrace Laying ceramic blocks in compliance with…
Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained…
1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel…
1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel…
Due to unfavorable weather conditions, no construction work is being done at the site today.
Building A 1. Formwork is installed, concrete is poured and compacted. Once the concrete has reached its strength, the formwork is dismantled and the stained…
1. Ceramoblock masonry. Block E on the 3rd floor on the terrace Check all dimensions and compliance with technological norms. Due to unfavorable weather…
1. Laying of porcelain stoneware, units on the 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and the…
1. Laying of porcelain stoneware, units on the 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and the…
1. reinforcement of the floor slab, Villa 13 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand loads…
1. Ceramoblock masonry. Block B on the 3rd floor, Block C on the 1st floor, Block E on the 3rd floor Check all dimensions and compliance with technological…
Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained…
1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel…
1. Laying of porcelain stoneware, units on the 1st , 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and…
Villas. — 1- Reinforcing the floor slab, Villa 13 It is necessary to increase the strength and stability of the structure, which allows the slab to withstand…
1. Ceramoblock masonry. Block B on the 3rd floor, Block C on the 1st floor, Block E on the 3rd floor Checking all dimensions and compliance with technological…
Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained…
1. diamond drilling of engineering holes, 10 and 12 floors The marking and drilling is carried out, which is necessary for the installation of communications of…
1. Laying of porcelain tiles, units on the 1st, 2nd and 4th residential floor Leveling of the surface and laying of tiles with respect to joints and necessary…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st