Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua —

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua —

Wyndham Grand Batumi Gonio. Aqua — 1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel. 2. Preparation of openings for the installation of stained glass To create the correct size and shape of openings, which ensures reliable installation of stained glass and their aesthetic design. 3. Arranging mocap, 12th floor Allows visualization and verification of the design and materials of the hotel room. 4. Facade arrangement, 4,6,9 floors Facade works on balconies. 5. Ceramoblock masonry, 4-6 floors Checking all dimensions and compliance with technological norms. There are also works on installation of decorative columns, works on roofing, works on preparation of elevator shafts for installation of elevator.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news