Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Installation of engineering systems.
Installation of ventilation system.
2. Block A. Plastering works.
Plastering of columns in the basement.
3. Arrangement of storm water drainage.
Fabrication and sealing of storm sewerage boxes.
4. Plumbing and electrical installation works.