Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
Priming of the facade.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. finishing works, 20th floor.
Laying tiles on the balconies.

4. Plastering works.
Plastering of walls on the balconies.

5. Waterproofing works.
In units on the balconies of the 19th floor and on the roof of the building.

6. Infrastructure building.
Installation of floor slab formwork 2 floor.