Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Electrical installation work.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Plastering work.
Installation of decorative plaster.
4. Installation of plasterboard frames.
Covering of ceiling frames on balconies.
5. Finishing works.
Laying tiles on balconies.
6. Infrastructure building.
Reinforcement of vertical structures for the construction of 3 floors.