Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Plastering works.

Plastering walls.

3. Facade works.

Plastering the facade.

4. Workshop works.

Manufacturing stairs.

Block B

1. Ceiling installation.

Installation of ceiling frames.

2. Elevator shaft installation.

Block laying in elevator portals.

3. Drilling of engineering holes.

For subsequent installation of engineering systems.