Get a Consultation

Wyndham Grand Batumi Gonio Events

  • News
  • Media publications
  • Articles

08.06.2024 — Wyndham Grand Residences Batumi Gonio.

Family Club — In Block A, reinforcement of the roof outlet cover slab is being carried out, and laying of walls with ceramic block on the 2nd floor continues.

08.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera

In block A on the 2nd floor the walls are being laid with ceramic block. In block B the floor slab formwork is being assembled. Reinforcement of vertical…

08.06.2024 — Wyndham Grand Residences Batumi Gonio.

Aqua — On the 4th construction floor (3 hotel floors) the installation of technological openings is in progress. On the 7th (6th) floor the installation of…

07.06.2024 — Elite Family Residence

Plastering works have been completed, facade works and masonry of internal partitions on the 1st floor are in progress. Hot and cold water supply systems…

07.06.2024 — Wyndham Grand Residences Batumi Gonio. Villas

Excavation and fencing of the site is underway.

07.06.2024 — Wyndham Grand Residences Batumi Gonio.

Family Club — Block A - reinforcing of the roof exit slab is being done, laying of walls with ceramic block on the 2nd floor continues.

Georgia's GDP Continues to Grow in 2023

In June 2023, Georgia's GDP increased by 7.7%. The average growth rate for the first half of 2023 was 7.6%, according to the Georgian National Statistical…

New Premium Hotel From Wyndham Hotels & Resorts Opens in Greece

The world’s largest hotel network, Wyndham Hotels & Resorts, has unveiled its first European property under one of its two premium brands, Registry Collection…