05.06.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 7th construction (6 hotel) floor the installation of balcony framing boards is in progress. On the 6th (5) floor, technological openings are being installed.
05.06.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 7th construction (6 hotel) floor the installation of balcony framing boards is in progress. On the 6th (5) floor, technological openings are being installed.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st