1. plastering works. Preparatory work for plastering internal walls in the villas. 2. Arrangement of curbs for installation of stained glass structures…
Construction progress, complex updates and real estate investment news from Batumi
1. plastering works. Preparatory work for plastering internal walls in the villas. 2. Arrangement of curbs for installation of stained glass structures…
1. Block A. Facade works. Reinforcement with mineral wool, facade insulation. 2. Block A. Slopes installation. 3. Block B. Installation of double-glazed…
Block A 1. Plastering works. — Plastering of walls, 2, 5 floors. — Plastering of slopes, 4th floor. 2. Facade works. Reinforcement of mineral wool, insulation…
1. Installation of engineering systems. — Installation of storm water drainage risers, 19th floor. — Electrical installation, 8th floor. — Plumbing work…
1. plastering works. Preparatory work for plastering internal walls in the villas. 2. Arrangement of curbs for installation of stained glass structures…
1. Block A. Plastering work. Plastering of columns. 2. Block B. Installation of double-glazed windows. Glass installation.
Block A 1. Plastering works. — Plastering of walls, 2, 5 floors. — Plastering of slopes, 4th floor. 2. Facade works. Reinforcement of mineral wool, insulation…
1. Installation of engineering systems. — Installation of storm water drainage risers, 18–20 floors. — Electrical installation, 8th floor. — Plumbing works…
1. Masonry works, villa 10. Ceramoblock masonry internal walls. 2. Plastering works. Preparatory work for plastering internal walls in the villas. 3…
Block A 1. Plastering works. — Plastering of walls, 2, 5 floors. — Plastering of slopes, 4th floor. Landscaping. 1. Arrangement of a fence. Concreting of the…
1. Installation of engineering systems. Installation of storm water drainage risers, 14–17 floors. 2. Plastering works. Plastering of balconies. 3. Masonry…
1. plastering works. Plastering of internal walls in the villas. 2. Arrangement of curbs for installation of stained glass structures. — Arrangement of the…
1. Block A. Plastering works. Plastering of columns. 2. Block B. Installation of stained glass windows and glazing. Installation of double-glazed windows. No…
Block A 1. Plastering works. — Plastering of walls, 2, 5 floors. — Plastering of slopes, 4th floor. 2. Facade works. Arrangement of reinforcing layer on mineral…
1. Installation of engineering systems. — Installation of plumbing, 14–15 floor. — Installation of electrics, 15th-16th floor. 2. Installation of double-glazed…
1. plastering works. Plastering of internal walls in the villas. 2. Arrangement of curbs for installation of stained glass structures. — Arrangement of the…
1. Block A, B, C. Facade works. — Facade insulation, installation of mineral wool. — Installation of soffits. 2. Block E. Waterproofing works. -Preparation of…
Block A 1. Plastering works. — Plastering of walls, 2, 5 floors. — Plastering of slopes, 4th floor. 2. Facade works. Arrangement of reinforcing layer on mineral…
1. Installation of engineering systems. — Installation of ventilation system. — Installation of electrics, 8th, 15th floor. — Sewerage installation, 10th floor…
1. Block A, B, C. Facade works. — Facade insulation, installation of mineral wool. — Installation of soffits. 2. Block C. Waterproofing works. -Preparation of…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st