1. Block С. Formwork removal from and installation for the staircases. It is necessary to create the precise shape and geometry of the staircase, support the…
Construction progress, complex updates and real estate investment news from Batumi
1. Block С. Formwork removal from and installation for the staircases. It is necessary to create the precise shape and geometry of the staircase, support the…
Building A 1. Installation of drywall profiles, 2nd – 3rd floors. To create a strong and stable base that forms the walls. 2. Facade works. The facade works…
1. Facade works, the 16th – 18th floors. This includes the installation of facade elements on balconies. Facade is being winterized. 2. Installation of stained…
1. Installation of firefighting and alarm systems. 2. Plumbing. - The laying of heating mains in common areas has been completed. - Air condition installation…
— 1. Installation of safety bars, Villa 1. 2. Insulation of the floor slab, Villa 14. It is essential for enhancing the building's energy efficiency. 3…
1. Block С. Formwork removal from and installation for the staircases. It is necessary to create the precise shape and geometry of the staircase, support the…
Building A 1. Diamond drilling for engineering openings, the 1st floor. The layout and drilling are underway; it is necessary for future hotel utility…
1. Diamond drilling for engineering openings, the 4th - 6th, 18th floors. Layout and drilling are underway, necessary for future hotel utility installations. 2…
1. Installation of firefighting and alarm systems. 2. Plumbing. - The laying of heating mains in common areas has been completed. - Air condition installation…
1. Excavation of soil from the outer section of the foundation for insulation, Villa 5. The works are completed for Villa 5. Due to adverse weather conditions…
1. Block С. Formwork removal from and installation for the staircases, in 2 townhouses. It is necessary to create the precise shape and geometry of the…
Building A 1. Diamond drilling for engineering openings, the 1st floor. The layout and drilling are underway, it is necessary for future hotel utility…
1. Diamond drilling for engineering openings, the 4th - 6th, 18th floors. Layout and drilling are underway, necessary for future hotel utility installations. 2…
1. Installation of firefighting and alarm systems. 2. Plumbing. - Laying of heating mains in common areas. Installation of cold and hot water supply systems…
1. Completion of backfilling the internal section of the foundation, Villa 16. It enhances thermal insulation and evenly distributes the load on the foundation…
1. Block С. Formwork removal from and installation for the staircases, in 2 townhouses. It is necessary to create the precise shape and geometry of the…
Building A 1. Diamond drilling for engineering openings, the 1st floor. The layout and drilling are underway, it is necessary for future hotel utility…
1. Diamond drilling for engineering openings, the 4th - 6th , 18th floors. Layout and drilling are underway, necessary for future hotel utility installations…
1. Installation of smoke extraction system. The smoke extraction system is being installed. 2. Plumbing. - Laying of heating mains in common areas. Installation…
1. Completion of column formwork removal, Villas 8, 9. Removal of formwork after concrete hardening to complete the structure and prepare for the next…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st