fbpx

01.05.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 2nd construction (1 hotel) floor measurements for installation of stained glass windows have been started. On the 19th (18th) floor the loading of building materials and laying of walls with ceramic block continues. A capital fence is being built on the territory.