01.05.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Concreting of the preparation for the 1st floor of the infrastructure building has been carried out. Block A – laying of walls with ceramic block on the 2nd floor. Block B – installation of retaining wall formwork. Block C – foundation reinforcement is in progress. Block E – installation of drainage system.