fbpx

01.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua The columns have been concreted on the 13th construction (12th hotel) floor. The construction of ceramic block walls is underway on the 2nd construction (1st hotel) and the 3rd construction (2nd hotel) floors.