Get a Consultation

← All news

02.02.2024 — Elite Family Residence

Real estatePublished Updated 1 min read1 views
Share:Link copied
02.02.2024 — Elite Family Residence

02.02.2024 — Elite Family Residence — The masonry of internal partition walls on the floors is in progress. Stained glass windows are being installed on the 2nd construction (1 residential) floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news