02.09.2024 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
02.09.2024 — Elite Family Residence

02.09.2024 — Elite Family Residence — Finishing of the northern, southern and western facades, ventilation shafts on the roof, installation of metal railings continues at the site. The installation of drywall guides on the walls of the bathrooms, preparation of the elevator shaft, covering of external communications with aquapanels is in progress. Puttying of walls (second layer) is underway in the mockup, electrical installation works on the first floor (wiring, integrity testing).