02.09.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block B, ceramic block (second floor), fireplaces and parapet are being laid, as well as laying of ventilation shafts on the roof. In block C - installation of reinforced floor frame. And in block E - monolithic sidewalls for stained glass windows.