03.03.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Block A Preparation for installation of the 5th floor slab formwork has started. Block B The formwork for the 3rd stage of the basement wall is being assembled.
03.03.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Block A Preparation for installation of the 5th floor slab formwork has started. Block B The formwork for the 3rd stage of the basement wall is being assembled.
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. AquaGet personal advice from a specialist in branded real estate Wyndham Grand