fbpx

03.05.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Loading of ceramic block on the floors and laying of walls on the 2nd floor is carried out in Block A. In Block B the ballast is being backfilled. Foundation reinforcement continues in Block C.