fbpx

04.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, the dismantled formwork from the floors continues to be lowered. In Block B – reinforcement of the 2nd stage of the foundation slab. Ceramic block walls and partitions are being laid in Block E.