fbpx

04.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, the walls are being laid with ceramic block. In Block B, the vertical structure formwork is being dismantled and the floor slab formwork is being installed. In the infrastructure building, the vertical structure formwork is being assembled.