Get a Consultation

← All news

04.08.2024 — Elite Family Residences

Real estatePublished 1 min read0 views
Share:Link copied
04.08.2024 — Elite Family Residences

04.08.2024 — Elite Family Residences — Work is underway on the device of gas silicate block on the -1 floor, installation of water fire extinguishing system pipes, laying of cable lines for lighting balconies, installation of apartment electrical panels and the device of curbs on the balconies.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news