08.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In the infrastructure building, the installation of the vertical structure formwork is in progress. In Block A, the masonry walls are being laid with ceramic block. Reinforcement of the floor slab is being carried out in Block B. Earthworks are being carried out in Block D.