08.05.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Concreting of the 2nd stage of the staircases was carried out on the 5th floor of Block A. On the 1st floor, the walls are being laid with ceramic block. In Block B, the floor slab formwork is being assembled.