Get a Consultation

← All news

08.08.2024 — Elite Family Residence

Real estatePublished 1 min read0 views
Share:Link copied
08.08.2024 — Elite Family Residence

08.08.2024 — Elite Family Residence — Painting works on mockup, 2 construction (1 residential) and 3 construction (2 residential) floors are in progress. Facade works, installation of apartment electric boards, installation of GKL in common areas, installation of low-current water fire extinguishing systems, installation of water fire extinguishing system pipes, installation of gas silicate block on the -1 floor, wiring of cable lines for lighting of balconies and earthing of the building are in progress.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news