Get a Consultation

← All news

09.09.2024 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
09.09.2024 — Elite Family Residence

09.09.2024 — Elite Family Residence — Finishing of the south and west facade, connection of water supply system, installation of reducers, installation of metal railings, tying of fire pump, digging of trench for sewerage is in progress. On the ground floor, finishing of walls and installation of plasterboard rails for ceilings is in progress. On the first floor electrical work is being carried out (wiring, continuity testing). The walls of the bathroom are being finished in the mockup.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news