10.12.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Work is underway to install the formwork for the floor slab of the 19th construction (18th hotel) floor. On the 11th (10th) floor, the wall masonry with ceramic block is in progress.
10.12.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Work is underway to install the formwork for the floor slab of the 19th construction (18th hotel) floor. On the 11th (10th) floor, the wall masonry with ceramic block is in progress.