fbpx

13.04.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Reinforcement of vertical structures is being carried out in Block A. In Block B, the vertical structures formwork is being assembled, waterproofing and insulation of the underground part of the foundation is being installed.