13.08.2024 — Elite Family Residence — Facade works and installation of water fire extinguishing system pipes continue at the site. Laying of porcelain stoneware in the mockup is in progress. Painting works are underway on the 1st floor.
13.08.2024 — Elite Family Residence — Facade works and installation of water fire extinguishing system pipes continue at the site. Laying of porcelain stoneware in the mockup is in progress. Painting works are underway on the 1st floor.