14.03.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15th hotel) and 18th (17th) floors the walls are being laid with ceramic block. Loading of construction materials on the floors continues.
14.03.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15th hotel) and 18th (17th) floors the walls are being laid with ceramic block. Loading of construction materials on the floors continues.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st