14.09.2024 — Elite Family Residence — Facade finishing, installation of metal railings, waterproofing of fire tanks, and trial tile installation continue at the site. On the ground floor the walls are being finished. On the first floor – installation of plasterboard rails for ceilings. On the third and fourth floors – electrical installation works (wiring, continuity testing).