14.12.2023 — Elite Family Residence — On the 5th construction (4 residential), 6th (5) and 7th (6) floors, the laying of walls with ceramic block continues. Loading of construction materials on the floors is in progress.
14.12.2023 — Elite Family Residence — On the 5th construction (4 residential), 6th (5) and 7th (6) floors, the laying of walls with ceramic block continues. Loading of construction materials on the floors is in progress.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st