15.04.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Reinforcement of vertical structures is underway on the 5th floor of Block A. In Block B, the floor slab formwork is being assembled, the insulation of the underground part of the foundation is being installed and the backfilling of the excavation slots is being carried out.