15.08.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Fireplaces are being installed in Block A. In block B - laying of ceramic block walls. In blocks A and B, staircases are being installed, and in block C - floor slab formwork. In block E, the construction of technological openings in the roof continues.
15.08.2024 — Wyndham Grand Residences Batumi Gonio.
More news
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Aqua