17.08.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Fireplaces are being installed in Block A. In block B - laying of ceramic block walls. And in block C - installation of staircase formwork, as well as the floor slab on the second floor.
17.08.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Fireplaces are being installed in Block A. In block B - laying of ceramic block walls. And in block C - installation of staircase formwork, as well as the floor slab on the second floor.
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. AquaGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st